Up to 70% token savings
on optimized agent setups
Trusted by teams at
CODING AGENTS & VIBE TOOLS
Whatever you build with, Powabase is the backend behind it. Connect through the agent skill, the REST API, or the auth guide, then build on real Postgres, storage, auth, and agents.
Anthropic's agentic coding tool for the terminal, IDE, and CI.
OpenAI's CLI agent with sandboxed file and shell access.
Google's Gemini agent IDE that runs agents in parallel.
Open-source terminal agent that runs on 75+ model providers.
Cloud IDE and Agent that builds and hosts full-stack apps.
Turns a prompt into a working web app.
Vercel's tool for generating and shipping Next.js UI.
Builds complete internal tools straight from a prompt.
In-browser builder that writes, runs, and deploys apps.
BUILD WITH AI
Install the Powabase skill once and your coding agent speaks the platform natively. Describe what you want — it wires up retrieval, agents, and workflows behind a single REST API.
One REST API instead of a vector database, an agent framework, and the glue code between them.
on optimized agent setups
for AI applications
from zero to a working product
BACKEND
Postgres with RLS, a first-class auth service, object storage, and realtime. Access it through PostgREST, the REST/GraphQL-style API, or a direct database connection.

RETRIEVAL
Upload PDFs, images, office files, or URLs — Powabase extracts, chunks, embeds, and indexes them. Built-in OCR 91% accuracy (OlmOCR-Bench). RAG pipeline 98.7% accuracy (FinanceBench). BM25, pgvector, hybrid search, and SOTA rerankers included. Handles multimodal content indexing.

AGENTS
Define ReAct orchestrations with multiple LLMs, knowledge bases, and tools. Runs stream over SSE with fully logged retrieval events, tool calls, token deltas, and citations. Sessions track multi-turn state. Use built-in tools like web search and code execute or add your own tools over HTTP or MCP.

WORKFLOWS
Build multi-step agent workflows by dragging and connecting blocks: triggers, conditions, agents, HTTP calls, code. Ask the natural-language copilot to design the flow for you. Deploy a workflow and turn it into an HTTP endpoint.

ARCHITECTURE
Every Powabase project gets a fully isolated stack — your own Postgres, your own Realtime, your own Storage. No shared logical databases, no noisy-neighbor risk, and SOC 2 / ISO 27001 compliance assumptions hold by default. The underlying compute is engineered for AI workloads: retrieval, rerank, and the agent runtime are co-located, so RAG stays hot and agent loops stay short.
ISOLATION
Isolated Postgres + Realtime + Storage
per project
No shared logical databases
no noisy-neighbor risk
Compliance-by-default
SOC 2 · ISO 27001
AI-TUNED COMPUTE
Co-located retrieval, rerank & LLM gateway
no extra network hops
Hot vector index next to Postgres
sub-100ms lookups¹
Up to 70% token savings
on optimized agents
¹ Warm-cache pgvector lookups on typical RAG payloads.
DEPLOYMENT
Ship on our managed cloud, or self-host the whole stack on your own infrastructure with Docker or Kubernetes. Either way, bring your own LLM keys so costs and compliance stay with you.
Fully managed. Provisioned in seconds — we handle updates, backups, and scaling.
Run the full stack on a single host with Docker Compose — ideal for evaluation and smaller deployments.
Deploy to your own cluster with the official Helm chart for scalable, high-availability self-hosting.
An open-source community edition (MIT) is coming end of June 2026 — Enterprise adds a supported, commercially-licensed edition with SLAs and private hosting. See Enterprise →
FAQ